Foundations and New drains

Make or break time, have not slept a wink, 6 cubic metres of C35 concrete being poured at 9:00am and I have to level it myself as it is poured. PS its Pi**ing it down.

Panning the new drain route.
dsc01505.jpg
Sh*t could happen if I get this one wrong

Here I might describe the photo above.

Brad lends a hand as rain fills Foundations
dsc01510.jpg
Will be glad when this is over

Here I might describe the photo above.

6 Cubic Metres in, talk about pressure
dsc01515.jpg

Here I might describe the photo above.

New Drain in
dsc01506.jpg

Here I might describe the photo above.

Grey pipe in for alignment only
dsc01523.jpg
God brick work looks good